Running Manhattan WMOS, SCALE or PkMS?
Manhattan would like you on Manhattan Active, and for WMOS, SCALE and PkMS shops that means a re-implementation. What you actually need is a better-run shift, and you can get that on the Manhattan system you already have without paying for a rebuild you don’t need yet.
Trusted by PepsiCo · P&G · GXO · Kellanova
$1M+
In savings and service gains on the systems you already have
<30 days
To real value, instead of the years your WMS upgrade would take
<80
IT hours, total
The cloud push is on
A rebuild
Moving from WMOS, SCALE or PkMS to Active is a re-implementation, not an upgrade you click through.
Every customization
Your scripts, RF flows and interfaces all get re-scoped and re-tested.
A long wait
Active’s planning features don’t reach your floor until the rebuild is done.
Move to Active when it makes sense for your business, and fix this year’s problems in the meantime.
What the upgrade pitch leaves out
Manhattan wants you on Active. Here’s what that means, and what to do in the meantime.
| What you’ll hear | What it means for your site | What you can do instead |
|---|---|---|
| Active is versionless, so you’ll never upgrade again. | You get a new release every quarter instead, and your team tests each one. | Warehouse AI sits on top and leaves your configuration alone. |
| SCALE is a great product. | Manhattan’s CEO has said SCALE isn’t part of the Active platform, so it doesn’t get Active’s AI. | Warehouse AI brings AI planning to SCALE sites today. |
| Moving to Active is a modernization. | It’s a re-implementation, so your scripts, RF flows and interfaces get re-scoped and rebuilt. | Get $1M+ in savings in 30 days, and move to Active when you’re ready. |
These are our paraphrases of common vendor messaging, not direct quotes.
The real problem
WMOS, SCALE and PkMS record the work, but they don’t decide how to run the shift, so those decisions end up in spreadsheets. Active adds planning, but only after a re-implementation.
How it works
Connect
We read from your Manhattan WMS through an API or a flat file, and your configuration stays exactly as it is.
Plan
AutoScheduler builds one live plan for labor, docks and waves, and it keeps re-solving that plan all shift.
Run
The plan shows up where your team already works, so nobody has to learn a new system.
Real customers. Real results.
+35%
More product flow
PepsiCo
9–14%
Higher labor productivity
Fortune 100 food & beverage manufacturer
96%
Less workforce planning time
P&G
Moving to Active anyway?
You’ll bank real savings before the Active project even kicks off, your site-specific logic stays out of custom WMS code, and you’ll walk into the new design with real data on how your site actually runs.
Straight answers
No. AutoScheduler plans labor, docks and waves on top of WMOS, SCALE or PkMS today, so you get the planning without the rebuild.
Yes. Manhattan is one of the WMSs AutoScheduler supports, including older on-prem versions, and it connects read-only through an API or a flat file.
It takes read access and about 80 IT hours spread out over four to eight weeks, and nothing in your WMS configuration has to change.
Free download
Would you rather talk it through? We’ll walk your floor and size the prize with you.
Manhattan, Manhattan Active, WMOS, SCALE and PkMS are trademarks of Manhattan Associates. AutoScheduler is not affiliated with or endorsed by Manhattan Associates. Vendor messaging on this page is paraphrased, not quoted. Sources: Manhattan Associates Q2 2026 earnings call; Manhattan product pages.